Tank Terminal Wastewater Treatment
Jan 24, 2024
Case Study
The Situation
A leading tank terminal operator with a commitment to innovation and sustainable infrastructure wanted to validate Aquacycl’s BioElectrochemical Treatment Technology (BETT®) to treat wastewater from hydrocarbon storage. The primary objective of the pilot was to demonstrate the BETT system can be used to achieve permit discharge compliance. The system was evaluated under different operating conditions over four months, including a stress test which added tank sludge and concentrated ether (both of which are currently being hauled away) to estimate the maximum removal rate.
During the operational period, the following measurements were conducted:
- Continuous measurement of pH, flow rate, conductivity and temperature
- Chemical oxygen demand (COD)
- Total suspended solids (TSS)
- Hydrocarbons, Aromatics, Alcohols
- Heavy metals
The Solution
Aquacycl installed a pilot-scale BETT® system to treat a side-stream of wastewater from one of the company’s facilities. Aquacycl’s BETT system provides a sustainable wastewater management for challenging industrial wastewaters.
The system operates with very low power consumption, and generates direct electricity, resulting in mitigating up to 50% of greenhouse gases that would otherwise be generated by use of conventional approaches. Aquacycl provides wastewater treatment as a service, with mutually agreed KPIs and includes real-time remote monitoring and control, regular maintenance, repair and annual sludge management. The BETT systems use natural bacteria to clean the wastewater, reduce sludge and produce direct electricity (no methane).
Locally sourced bacteria break down organic matter in the wastewater and release electrons during their natural process of respiration. The released electrons are captured as direct current and can be used to offset the power consumption of the system. The system is remotely monitored and controlled to ensure system performance and offsite troubleshooting capabilities.
At the client site, the BETT unit treated wastewater directly from the existing equalization tank and bypassed the dissolved air floatation (DAF) system that is in-use for the existing treatment system. The treated effluent from the BETT system was discharged to the existing aeration basin for additional posttreatment, except during the stress testing.
The Results
The discharge permit limit is 510 mgCOD/L, which the BETT system consistently met. The system achieved a maximum COD removal of 92% in an 8-hour hydraulic residence time (HRT); and an average removal of 74% over the duration of operation at 18-hours HRT. For total suspended solids (TSS), the permitted discharge concentration is 30.6 mg-TSS/L which the system was able to achieve, with a maximum TSS removal was 73% at a 12-hour HRT, and an average of 46% over a 18-hour HRT.
For the stress test, tank sludge was added and 70% of total COD was removed in 18- hours, with no disruption to BETT system. Subsequently, 30,000 ppm of Ether was added. 80% of Ether concentration was removed in 18 hours with no disruption to BETT system. The hydrocarbon removal activity exceeded expectations, as BETT was able to consistently achieve over 90% removal of all aromatic compounds, most longchain hydrocarbons, and ethers. The regulated compounds detected in incoming wastewater included phenol, nonyl phenol, acetone, acetophenone and octadecane.
For the stress test, tank sludge was added and 70% of total COD was removed in 18- hours, with no disruption to BETT system. Subsequently, 30,000 ppm of Ether was added. 80% of Ether concentration was removed in 18 hours with no disruption to BETT system. The modularity and flexibility of the system enables the client to treat side streams that cannot be handled by existing treatment or to support growth initiatives.
The Aquacycl BETT systems offer an efficient, cost-effective, and sustainable solution to the customer’s wastewater treatment.
More News and Articles
Jul 24, 2024
News
UK utilities place multiple orders for settlement tank technology
Northumbrian Water, Southern Water, and Dŵr Cymru upgrading wastewater sites
Three UK water utilities have agreed orders for the installation of a total of six conical settlement …
Jul 22, 2024
Article
Reusing wastewater, rethinking water: Maharashtra's roadmap
How Maharashtra turns wastewater into a resource
Water resource management is a critical issue globally, and in India, the state of Maharashtra is pioneering efforts to regulate and …
Jul 19, 2024
News
Kansas City advances fire hydrant leak detection technology
An acoustic fixed-base pipe monitoring technology that uses fire hydrants to host multi-sensor devices, has already found more than 30 leaks for Kansas City Water, says Lou Rossetti …
Jul 17, 2024
News
When two bores right a wrong
The Edge Underground team is adamant: there is always a risk of things going wrong on a trenchless project, even for the most prepared contractor.
Experience and having the right equipment can be the difference between …
Jul 15, 2024
News
Adapting to a region’s growing water and wastewater needs
Gippsland Water has completed two major projects to provide local communities with water security. Trenchless Australasia takes a look at the two projects helping increase water supply …
Jul 12, 2024
News
Connections made in Glastonbury
Difficult ground conditions called for a specialist solution when new PE pipes for potable water services had to be installed underneath two, 10-metre road crossings in the grounds of the UK’s ultimate music festival …
Jul 10, 2024
Article
The Water-Energy Nexus: Interdependence and Challenges
Niclas Andersson, CEO of AirWater2All, explains the connection between water and energy. The importance of this connection and the areas in which it needs to be considered are explained …
Jul 08, 2024
News
Minimising cultural impacts with trenchless technology
Yarra Valley Water is leveraging the benefits of trenchless technology to lessen impacts on the Upper Darebin Creek branch sewer project.
The project consists of building a 2.7km sewer pipe …
Jul 05, 2024
News
SprayWall: Reinforcing Underground Infrastructure with Unmatched Strength
In the trenchless technology industry, finding a rehabilitation solution that offers ease of installation and exceptional structural integrity is paramount.
For three decades, …
Jul 01, 2024
News
“Don’t let stereotypes hold you back”
Trenchless Australasia sat down with Rob Carr project manager Marie Piette to discuss her career and work at the microtunnelling contracting company.
From Norway to Cambodia and now Perth, Western Australia, …
Jun 28, 2024
News
Transforming Wastewater: Towards Climate-Neutral Sewage Treatment
Baden-Württemberg’s Minister President Winfried Kretschmann recently toured the Büsnau Training and Research Sewage Treatment Plant, where a pioneering project led by researchers …
Jun 26, 2024
News
Bothar advances with significant new contracts
Having commenced work on the Fitzroy to Gladstone Pipeline earlier this year, Bothar Boring and Tunnelling has announced the award of further contracts as part of its ongoing collaboration with …
Contact
Aquacycl
Sofia Babanova
Author
6342 Ferris Square
CA 92121 San Diego
United States
Phone:
+1 505 358 8044