New Rapid-set Cement MC-Floor TurboCem Offers Intrinsic Versatility
Dec 10, 2020
With its new fast-hardening cement MC-Floor TurboCem, MC-Bauchemie has hit the market with a truly one-for-all solution. An advanced ternary binder, this product is suitable for screeds that need to be both dimensionally stable and ready for covering at an early stage – whether for residential, commercial or industrial duty.
MC-Floor TurboCem is characterised by very good workability, low material consumption levels, high early and final strengths, low shrinkage and minimal stress development.
Fast-setting cements cure particularly quickly and are therefore especially suitable for screed repairs and general applications in which rapid load-bearing capacity and early overlay are required.
MC-Floor TurboCem, the new rapid-set cement from MC-Bauchemie, combines extended working time with fast, stress- and deformation-free hardening, while also enabling rapid accessibility and overlay readiness.
Multiple application possibilities with fast coverability
MC-Floor TurboCem is highly versatile and can be used indoors and outdoors both as a standard quick-acting cement for residential construction and as a special-purpose rapid-set cement for the production of industrial screeds or high-strength utility screeds. It is also suitable for damp rooms and heated screeds. Depending on the requirements, this one-for-all product can be effectively metered to produce precisely the desired screed formulation.
Thus offering a major advantage for screed layers, the new fast-hardening cement from MC-Bauchemie greatly facilitates handling while also reducing complexity in terms of storage, transport and, in particular, application variability. As less cement is required per screed mixture, using MC-Floor TurboCem can also lead to cost-efficiencies in comparison to common quick-acting cements.
Since the advanced ternary binder chemically binds considerably more water, only a small part of the mixing water used needs to evaporate. That means that, even under critical environmental conditions, overlay readiness can be effectively targeted without problem within the usual timeframe from 3 to 14 days.
For example, MC-Floor TurboCem offers a working time of ≥ 60 minutes for grade C35-F5 screeds, with walk-on accessibility after 16 hours and overlay or coating readiness after 7 to 10 days. And in the case of a grade C50-F7 screed, it offers a working time of ≥ 45 minutes, walk-on accessibility after 12 hours and overlay or coating readiness after 3 days.*
Very good application and low-shrink properties
While common quick-acting cements are often difficult to use – the screeds produced with them tend to “stick” and are usually more difficult to level – MC-Floor TurboCem offers excellent workability. And the raw material composition of this ternary rapid-set cement also facilitates the production of particularly low-shrinkage screeds.
This is especially essential in order to reduce any stresses that could otherwise cause the screed to curl or crack – be it in sloping screeds with widely varying thicknesses, screeds of exceptional thickness such as bonded screeds over 5 cm, large areas screeded without joints, or where the layout geometry is unfavourable. Without such a low-shrinkage solution, problems may arise especially with the early laying of large-format tiles or a fully bonded parquet floor.
*All values indicated relate to an air temperature of 10 °C and a relative humidity of 80 %.
More News and Articles
Apr 24, 2024
News
Sustainable drainage solutions: German Start-up transforms urban water management.
Germany boasts a well-established infrastructure for managing rainwater and wastewater, yet many developing countries lack such systems. Addressing this gap, …
Apr 22, 2024
News
HDD tooling that gets the job done
Horizontal directional drilling is a dynamic process that constantly changes and adapts to suit a range of applications across utilities and infrastructure. Operators looking to get the most from their equipment …
Apr 19, 2024
News
WATCH: Overnight with SAERTEX-LINER H20 in São Paulo
Available through Pipe Core, high-quality liner SAERTEX-LINER H20 performed under pressure in São Paulo, Brazil.
Maintaining aging potable water pipe infrastructure is a constant challenge …
Apr 17, 2024
News
Immersive media provides wastewater experience in Denmark
An immersive media experience (IMX) may not be what most people want when they think about industrial wastewater, but that is exactly what visitors can expect when they visit a new installation …
Apr 15, 2024
News
Spotlight on gender diversity at Pipe Core
Since founding in 2008, Pipe Core’s team has grown across all areas of the business and is now in a position where there are more females than males across the organisation. Research published in Harvard …
Apr 12, 2024
News
New Wave of Startups Scale Innovation to Solve Global Water Challenges
Innovators from Around the World Join Xylem’s 2024 Accelerator Program to Deploy Breakthrough Innovations for Utilities and Industrial Users of Water
A new group of startups …
Apr 08, 2024
News
Integrated sustainable electricity and clean drinking water systems
Altitude Water and New Use Energy Solutions have partnered to create integrated, mobile solar-plus-water generation systems that produce sustainable electricity and clean drinking …
Apr 05, 2024
News
How to Evaluate Hydraulic Fracture Risk in HDD Design
The design of horizontal directional drill (HDD) installations often requires an evaluation of the potential for hydraulic fracture of the soil layers through which an HDD passes. Evaluating …
Apr 02, 2024
News
Historic Project Linking Rome and Vatican City Uses Advanced Technology and Local Knowledge to Keep Water Flowing
Relocation of Major Sewer Infrastructure Enables Construction of Pedestrian Link for 35 Million Visitors to the 2025 Jubilee
Water …
Mar 27, 2024
News
USU Study Looks at Water Main Break Rates in the U.S. and Canada
Report Highlights Correlation Between Material and Diameter
Utah State University (USU) has published new research on water main breaks in the United States and Canada, examining …
Mar 26, 2024
News
Update BE-21: New Material in Course and Modules on Trenchless Pipe Installation
Online training on the topic of pipeline installation in civil engineering: Trenchless technology for underground drainage construction can be a resource-efficient, …
Mar 25, 2024
Article
Bacteria as a new weapon in wastewater treatment
In early November, San Diego based startup Aquacycl officially opened its first European office and test center at the Water Campus in Leeuwarden. The Netherlands Foreign Investment Agency (NFIA) …
Contact
MC-Bauchemie Müller GmbH & Co. KG
Saki M. Moysidis
Chief of PR & Communication
Am Kruppwald 1 - 8
46238 Bottrop
Germany
Phone:
+49 2041 101 640
Fax:
+49 2041 101 688