Virtual Construction Site: Lining with Spirally-Wound Pipes with Stationary Winding Machine
The given case of application presents the renovation of a defective sewer section consisting of concrete pipes DN 400 with a section length of 60 m by means of lining with spirally-wound pipes. This process belongs to the group of renovation processes and more specifically to lining with site-manufactured pipes.
Klicken Sie hier, um den Inhalt in einem neuen Tab oder Fenster zu öffnen.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: R. Stein (2020)
Fachbereich(e)
Renovation