BE-02 Open Cut Method: Utility Trench Construction - v01
The construction of sewers is still often carried out in the form of open cut construction. Depending on the design, this results in different pipe-soil systems with different external loads on the sewer.
After completing this module, you will have a sound knowledge of:
- rules and regulations;
- requirements for planning, tendering and construction of the pipeline zone, the shoring and the components and building materials;
- procedures for dewatering and
- process sequences of the open construction method.
Access is restricted.
Click here to be prompted for your credentials.
Prof. Dr.-Ing. Stein & Partner GmbH (2016)
Domain
Open cut method
Keywords
Open Cut method, Planning and design